The Portal was one of the largest projects. It required clearing out the face of the portal due to cracked substrate. Cribbing was added to support the entrance. The face was covered in webbing that is anchored with 8 foot bolts. The removal of the unstable rock enlarged our parking area.

Edit galleryp1 p3 p5 p2 p4 p6 4982 p4918 4961 5525 5629 5749 5666 4955